ITAC Assessment: GT0658
ITAC logo
ITAC Assessment: GT0658
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Metal Gratings
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 23
Plant Area 25,000
ft2
Annual Production 6,000
ton
Production Hrs. Annual 3,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $7,842 128,664
kWh
Electricity Demand $4,445 285
kW-mo/yr
Electricity Fees $4,713 -
Natural Gas $6,153 1,030
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,416 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,521

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
01 2.8113: Purchase gas directly from a contract gas supplier $742 - - - - - - $742
02 3.4155: Meter waste water $1,276 $500 - - - - $1,276
-
Tgal
-
03 2.8123: Pay utility bills on time $1,258 - - - - - - $1,258
04 2.3132: Recharge batteries on during off-peak demand periods $1,468 $200 - $1,385
-
kW-mo/yr
$83 - - -
05 3.6192: Use a less expensive method of waste removal $216 - - - - - - $216
06 2.7261: Install timers and/or thermostats $777 $600 $57
879
kWh
- - $720
-
MMBtu
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,316 $2,398 $821
13,482
kWh
$421
-
kW-mo/yr
$74 - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,363 $3,000 $851
14,068
kWh
$435
-
kW-mo/yr
$77 - - -
TOTAL RECOMMENDED $8,416 $6,698 $1,729
28,429
kWh
$2,241
-
kW-mo/yr
$234 $720
-
MMBtu
$1,276
-
Tgal
$2,216
TOTAL IMPLEMENTED $5,521 $1,300 $57
879
kWh
$1,385
-
kW-mo/yr
$83 $720
-
MMBtu
$1,276
-
Tgal
$2,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs