| Assessment Year | 1994 |
|---|---|
| Principal Product | Iron Castings |
| NAICS |
n/a
|
| SIC | 3321: Gray and Ductile Iron Foundries |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
63,700
ft2
|
| Annual Production | 12,700
ton
|
| Production Hrs. Annual | 2,600
hrs
|
| Location (State) | Nebraska |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $180,753 | 3,470,692 |
kWh
|
$0.052 |
| Natural Gas | $125,821 | 28,546 |
MMBtu
|
$4.41 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $39,719 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $33,402 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
|---|---|---|---|---|---|
| 01 | 4.652: Replace existing equipment with more suitable substitutes | $20,016 | $3,500 |
$20,016
-
kWh
|
|
| 02 | 2.4133: Use most efficient type of electric motors | $5,311 | $11,979 |
$5,311
101,114
kWh
|
|
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,311 | $8,410 |
$3,311
63,599
kWh
|
|
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,628 | $3,559 |
$2,628
31,653
kWh
|
|
| 05 | 2.7135: Install occupancy sensors | $961 | $950 |
$961
18,464
kWh
|
|
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,442 | $155 |
$2,442
46,893
kWh
|
|
| 07 | 2.4221: Install compressor air intakes in coolest locations | $2,335 | $326 |
$2,335
44,842
kWh
|
|
| 08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,045 | $765 |
$2,045
39,273
kWh
|
|
| 09 | 2.4314: Use synthetic lubricant | $670 | $510 |
$670
10,844
kWh
|
|
| TOTAL RECOMMENDED | $39,719 | $30,154 |
$39,719
356,682
kWh
|
||
| TOTAL IMPLEMENTED | $33,402 | $20,029 |
$33,402
235,346
kWh
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs