ITAC Assessment: KU0435
ITAC logo
ITAC Assessment: KU0435
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product candy coated popcorn
NAICS
n/a
SIC 2064: Candy and Other Confectionery Products
Sales Range $5
M
to 10
M
# of Employees 160
Plant Area 23,100
ft2
Annual Production 12,150,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $127,215 2,770,516
kWh
Natural Gas $143,670 38,628
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,372 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1213: Direct warmest air to combustion intake $6,681 $1,800 - $6,681
-
MMBtu
02 2.2511: Insulate bare equipment $2,005 $3,213 - $2,005
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,262 $8,110 $6,262
99,941
kWh
-
04 2.7135: Install occupancy sensors $996 $400 $996
21,688
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $440 $504 $440
2,638
kWh
-
06 2.7447: Install vinyl strip / high speed / air curtain doors $584 $197 $699
15,240
kWh
$(-115.0)
-
MMBtu
07 2.4221: Install compressor air intakes in coolest locations $404 $120 $404
8,792
kWh
-
TOTAL RECOMMENDED $17,372 $14,344 $8,801
148,299
kWh
$8,571
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs