Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product antennas
NAICS
n/a
SIC 3663: Radio and Television Broadcasting and Communications Equipment
Sales Range $10
M
to 50
M
# of Employees 340
Plant Area 165,000
ft2
Annual Production 82,500
pieces
Production Hrs. Annual 4,400
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $131,103 2,755,276
kWh
Natural Gas $35,463 9,676
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,160 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,283

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8121: Apply for tax-free status for energy purchases $6,218 $300 - - $6,218
02 2.3134: Shift from daytime to nighttime operation $17,492 $1,000 $17,492
-
kWh
- -
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $7,856 $29,000 $19,181
402,989
kWh
$(-11,325.0)
-
MMBtu
-
04 2.2437: Recover waste heat from equipment $7,795 $10,100 - $7,795
-
MMBtu
-
05 2.7447: Install vinyl strip / high speed / air curtain doors $3,951 $1,130 $2,288
48,066
kWh
$1,663
-
MMBtu
-
06 2.6218: Turn off equipment when not in use $3,050 $825 $195
4,103
kWh
$2,855
-
MMBtu
-
07 2.2511: Insulate bare equipment $460 $1,466 $460
9,672
kWh
- -
08 2.4314: Use synthetic lubricant $2,090 $2,363 $2,090
23,740
kWh
- -
09 2.1311: Replace electrically-operated equipment with fossil fuel equipment $837 $1,486 $1,200
25,205
kWh
$(-363.0)
-
MMBtu
-
10 2.7111: Reduce illumination to minimum necessary levels $3,404 $888 $3,404
71,512
kWh
- -
11 2.7135: Install occupancy sensors $1,297 $2,487 $1,297
27,257
kWh
- -
12 2.7142: Utilize higher efficiency lamps and/or ballasts $258 $360 $258
1,172
kWh
- -
13 2.7142: Utilize higher efficiency lamps and/or ballasts $452 $582 $452
5,275
kWh
- -
TOTAL RECOMMENDED $55,160 $51,987 $48,317
618,991
kWh
$625
-
MMBtu
$6,218
TOTAL IMPLEMENTED $14,283 $3,260 $6,402
126,025
kWh
$1,663
-
MMBtu
$6,218
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs