Assessment Year | 1994 |
---|---|
Principal Product | antennas |
NAICS |
n/a
|
SIC | 3663: Radio and Television Broadcasting and Communications Equipment |
Sales Range | $10 M to 50M |
# of Employees | 340 |
Plant Area |
165,000
ft2
|
Annual Production | 82,500
pieces
|
Production Hrs. Annual | 4,400
hrs
|
Location (State) | Nebraska |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $131,103 | 2,755,276 |
kWh
|
$0.048 |
Natural Gas | $35,463 | 9,676 |
MMBtu
|
$3.67 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $55,160 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,283 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.8121: Apply for tax-free status for energy purchases | $6,218 | $300 | - | - | $6,218 | |
02 | 2.3134: Shift from daytime to nighttime operation | $17,492 | $1,000 |
$17,492
-
kWh
|
- | - | |
03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $7,856 | $29,000 |
$19,181
402,989
kWh
|
$(-11,325.0)
-
MMBtu
|
- | |
04 | 2.2437: Recover waste heat from equipment | $7,795 | $10,100 | - |
$7,795
-
MMBtu
|
- | |
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $3,951 | $1,130 |
$2,288
48,066
kWh
|
$1,663
-
MMBtu
|
- | |
06 | 2.6218: Turn off equipment when not in use | $3,050 | $825 |
$195
4,103
kWh
|
$2,855
-
MMBtu
|
- | |
07 | 2.2511: Insulate bare equipment | $460 | $1,466 |
$460
9,672
kWh
|
- | - | |
08 | 2.4314: Use synthetic lubricant | $2,090 | $2,363 |
$2,090
23,740
kWh
|
- | - | |
09 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $837 | $1,486 |
$1,200
25,205
kWh
|
$(-363.0)
-
MMBtu
|
- | |
10 | 2.7111: Reduce illumination to minimum necessary levels | $3,404 | $888 |
$3,404
71,512
kWh
|
- | - | |
11 | 2.7135: Install occupancy sensors | $1,297 | $2,487 |
$1,297
27,257
kWh
|
- | - | |
12 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $258 | $360 |
$258
1,172
kWh
|
- | - | |
13 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $452 | $582 |
$452
5,275
kWh
|
- | - | |
TOTAL RECOMMENDED | $55,160 | $51,987 |
$48,317
618,991
kWh
|
$625
-
MMBtu
|
$6,218 | ||
TOTAL IMPLEMENTED | $14,283 | $3,260 |
$6,402
126,025
kWh
|
$1,663
-
MMBtu
|
$6,218 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs