ITAC Assessment: KU0433
ITAC logo
ITAC Assessment: KU0433
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Flour
NAICS
n/a
SIC 2041: Flour and Other Grain Mill Products
Sales Range $50
M
to 100
M
# of Employees 130
Plant Area 75,000
ft2
Annual Production 363,000,000
lb
Production Hrs. Annual 8,160
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $593,253 17,640,094
kWh
Natural Gas $126,763 42,580
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,071 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,626

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $21,221 $37,523 $21,221
630,715
kWh
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $15,106 $6,315 $15,106
449,004
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,113 $11,279 $5,113
120,750
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,706 $3,160 $1,706
50,703
kWh
05 2.7135: Install occupancy sensors $1,461 $950 $1,461
39,566
kWh
06 2.7132: Install timers on light switches in little used areas $878 $180 $878
26,084
kWh
07 2.4221: Install compressor air intakes in coolest locations $586 $38 $586
16,413
kWh
TOTAL RECOMMENDED $46,071 $59,445 $46,071
1,333,235
kWh
TOTAL IMPLEMENTED $28,626 $52,000 $28,626
818,581
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs