Assessment Year | 1994 |
---|---|
Principal Product | Pasta |
NAICS |
n/a
|
SIC | 2098: Macaroni, Spaghetti, Vermicelli, and Noodles |
Sales Range | $50 M to 100M |
# of Employees | 90 |
Plant Area |
62,000
ft2
|
Annual Production | 81,600,000
lb
|
Production Hrs. Annual | 8,160
hrs
|
Location (State) | Nebraska |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $154,027 | 4,317,116 |
kWh
|
$0.036 |
Natural Gas | $65,120 | 22,405 |
MMBtu
|
$2.91 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $26,111 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,456 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 3.1191: Change procedures / equipment / operating conditions | $8,499 | $1,000 |
$(-2,280.0)
(-63,892)
kWh
|
$10,779
-
MMBtu
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,954 | $12,296 |
$3,954
110,785
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $701 | $1,328 |
$701
19,637
kWh
|
- | - | |
04 | 2.7135: Install occupancy sensors | $1,015 | $850 |
$1,015
28,429
kWh
|
- | - | |
05 | 3.2176: Increase use of automation | $3,426 | $1,000 |
$(-42.0)
(-1,172)
kWh
|
- | $3,468 | |
06 | 2.4226: Use / purchase optimum sized compressor | $2,605 | - |
$2,605
72,978
kWh
|
- | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $1,141 | $250 |
$1,141
31,946
kWh
|
- | - | |
08 | 2.4133: Use most efficient type of electric motors | $4,770 | $11,382 |
$4,770
133,646
kWh
|
- | - | |
TOTAL RECOMMENDED | $26,111 | $28,106 |
$11,864
332,357
kWh
|
$10,779
-
MMBtu
|
$3,468 | ||
TOTAL IMPLEMENTED | $15,456 | $26,006 |
$11,988
335,874
kWh
|
- | $3,468 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs