ITAC Assessment: KU0041
ITAC logo
ITAC Assessment: KU0041
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product WASTE WATER TREATMENT EQUIPMENT
NAICS
n/a
SIC 3589: Service Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 900
pieces
Production Hrs. Annual 2,083
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $96,623 1,637,456
kWh
Natural Gas $28,604 9,952
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,130 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,751

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $12,933 - $12,933
219,226
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,751 $7,500 $1,751
28,722
kWh
-
03 2.6212: Turn off equipment during breaks, reduce operating time $2,027 $287 $647
10,844
kWh
$1,380
-
MMBtu
04 2.2711: Utilize outside air instead of conditioned air for drying $738 $1,800 - $738
-
MMBtu
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,547 - $1,547
26,377
kWh
-
06 2.2437: Recover waste heat from equipment $1,134 $800 - $1,134
-
MMBtu
TOTAL RECOMMENDED $20,130 $10,387 $16,878
285,169
kWh
$3,252
-
MMBtu
TOTAL IMPLEMENTED $1,751 $7,500 $1,751
28,722
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs