ITAC Assessment: KU0429
ITAC logo
ITAC Assessment: KU0429
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Buses
NAICS
n/a
SIC 3713: Truck and Bus Bodies
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 93,346
ft2
Annual Production 1,300
pieces
Production Hrs. Annual 2,535
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $57,246 954,279
kWh
Natural Gas $37,909 16,236
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,188 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,880

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7224: Reduce space conditioning during non-working hours $4,336 $1,050 $1,705
28,429
kWh
$2,631
-
MMBtu
-
02 2.2437: Recover waste heat from equipment $7,231 $37,260 $(-1,406.0)
(-23,447)
kWh
$8,637
-
MMBtu
-
03 3.4151: Minimize water usage $11,654 $7,175 - - $11,654
04 2.7145: Install skylights $8,263 $29,640 $8,263
137,749
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,920 $4,726 $1,920
19,343
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,580 $879 $1,580
17,292
kWh
- -
07 2.7135: Install occupancy sensors $756 $1,550 $756
12,603
kWh
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $879 $1,800 $879
14,068
kWh
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $756 $2,793 $756
12,603
kWh
- -
10 2.7132: Install timers on light switches in little used areas $721 $170 $721
12,016
kWh
- -
11 2.2437: Recover waste heat from equipment $282 $1,420 - $282
-
MMBtu
-
12 2.4314: Use synthetic lubricant $440 $1,395 $440
7,327
kWh
- -
13 2.7447: Install vinyl strip / high speed / air curtain doors $370 $1,386 - $370
-
MMBtu
-
TOTAL RECOMMENDED $39,188 $91,244 $15,614
237,983
kWh
$11,920
-
MMBtu
$11,654
TOTAL IMPLEMENTED $17,880 $18,929 $5,856
75,322
kWh
$370
-
MMBtu
$11,654
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs