Assessment Year | 1994 |
---|---|
Principal Product | Concrete Finishing Tools |
NAICS |
n/a
|
SIC | 3423: Hand and Edge Tools, Except Machine Tools and Handsaws |
Sales Range | $10 M to 50M |
# of Employees | 130 |
Plant Area |
108,000
ft2
|
Annual Production | 2,500,000
pieces
|
Production Hrs. Annual | 4,693
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $124,922 | 2,105,510 |
kWh
|
$0.059 |
Natural Gas | $40,215 | 11,048 |
MMBtu
|
$3.64 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $22,348 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,081 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4323: Use optimum size and capacity equipment | $6,707 | $12,000 |
$3,721
62,720
kWh
|
$2,986
-
MMBtu
|
- | - | |
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $6,145 | $14,000 |
$8,312
140,094
kWh
|
$(-2,167.0)
-
MMBtu
|
- | - | |
03 | 2.7135: Install occupancy sensors | $2,604 | $2,150 |
$2,604
43,962
kWh
|
- | - | - | |
04 | 2.7134: Use photocell controls | $643 | $120 |
$643
10,844
kWh
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,695 | $12,025 |
$4,042
67,995
kWh
|
- | $1,653 | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $241 | $150 |
$155
2,638
kWh
|
- | - | $86 | |
07 | 2.4221: Install compressor air intakes in coolest locations | $313 | $377 |
$313
5,275
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $22,348 | $40,822 |
$19,790
333,528
kWh
|
$819
-
MMBtu
|
$1,653 | $86 | ||
TOTAL IMPLEMENTED | $12,081 | $26,175 |
$12,509
210,727
kWh
|
$(-2,167.0)
-
MMBtu
|
$1,653 | $86 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs