ITAC Assessment: KU0425
ITAC logo
ITAC Assessment: KU0425
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Concrete Finishing Tools
NAICS
n/a
SIC 3423: Hand and Edge Tools, Except Machine Tools and Handsaws
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 108,000
ft2
Annual Production 2,500,000
pieces
Production Hrs. Annual 4,693
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $124,922 2,105,510
kWh
Natural Gas $40,215 11,048
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,348 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,081

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4323: Use optimum size and capacity equipment $6,707 $12,000 $3,721
62,720
kWh
$2,986
-
MMBtu
- -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $6,145 $14,000 $8,312
140,094
kWh
$(-2,167.0)
-
MMBtu
- -
03 2.7135: Install occupancy sensors $2,604 $2,150 $2,604
43,962
kWh
- - -
04 2.7134: Use photocell controls $643 $120 $643
10,844
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $5,695 $12,025 $4,042
67,995
kWh
- $1,653 -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $241 $150 $155
2,638
kWh
- - $86
07 2.4221: Install compressor air intakes in coolest locations $313 $377 $313
5,275
kWh
- - -
TOTAL RECOMMENDED $22,348 $40,822 $19,790
333,528
kWh
$819
-
MMBtu
$1,653 $86
TOTAL IMPLEMENTED $12,081 $26,175 $12,509
210,727
kWh
$(-2,167.0)
-
MMBtu
$1,653 $86
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs