| Assessment Year | 1994 |
|---|---|
| Principal Product | Concrete Finishing Tools |
| NAICS |
n/a
|
| SIC | 3423: Hand and Edge Tools, Except Machine Tools and Handsaws |
| Sales Range | $10 M to 50M |
| # of Employees | 130 |
| Plant Area |
108,000
ft2
|
| Annual Production | 2,500,000
pieces
|
| Production Hrs. Annual | 4,693
hrs
|
| Location (State) | Kansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $124,922 | 2,105,510 |
kWh
|
$0.059 |
| Natural Gas | $40,215 | 11,048 |
MMBtu
|
$3.64 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $22,348 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $12,081 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4323: Use optimum size and capacity equipment | $6,707 | $12,000 |
$3,721
62,720
kWh
|
$2,986
-
MMBtu
|
- | - | |
| 02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $6,145 | $14,000 |
$8,312
140,094
kWh
|
$(-2,167.0)
-
MMBtu
|
- | - | |
| 03 | 2.7135: Install occupancy sensors | $2,604 | $2,150 |
$2,604
43,962
kWh
|
- | - | - | |
| 04 | 2.7134: Use photocell controls | $643 | $120 |
$643
10,844
kWh
|
- | - | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,695 | $12,025 |
$4,042
67,995
kWh
|
- | $1,653 | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $241 | $150 |
$155
2,638
kWh
|
- | - | $86 | |
| 07 | 2.4221: Install compressor air intakes in coolest locations | $313 | $377 |
$313
5,275
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $22,348 | $40,822 |
$19,790
333,528
kWh
|
$819
-
MMBtu
|
$1,653 | $86 | ||
| TOTAL IMPLEMENTED | $12,081 | $26,175 |
$12,509
210,727
kWh
|
$(-2,167.0)
-
MMBtu
|
$1,653 | $86 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs