ITAC Assessment: KU0417
ITAC logo
ITAC Assessment: KU0417
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Fiberglass Boats
NAICS
n/a
SIC 3732: Boat Building and Repairing
Sales Range $50
M
to 100
M
# of Employees 275
Plant Area 108,000
ft2
Annual Production 2,600
pieces
Production Hrs. Annual 3,250
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $131,477 2,007,620
kWh
Natural Gas $66,620 24,033
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,220 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,592

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2437: Recover waste heat from equipment $5,107 $24,322 $(-2,610.0)
(-39,859)
kWh
$7,717
-
MMBtu
-
02 2.4314: Use synthetic lubricant $1,151 $1,978 $1,151
17,585
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $844 $3,966 $844
12,896
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $198 $300 $134
2,052
kWh
- $64
05 2.7142: Utilize higher efficiency lamps and/or ballasts $172 $192 $77
1,172
kWh
- $95
06 2.4221: Install compressor air intakes in coolest locations $518 $577 $518
7,913
kWh
- -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $230 $180 $230
3,517
kWh
- -
TOTAL RECOMMENDED $8,220 $31,515 $344
5,276
kWh
$7,717
-
MMBtu
$159
TOTAL IMPLEMENTED $1,592 $4,723 $1,592
24,326
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs