Assessment Year | 1993 |
---|---|
Principal Product | Fiberglass Boats |
NAICS |
n/a
|
SIC | 3732: Boat Building and Repairing |
Sales Range | $50 M to 100M |
# of Employees | 275 |
Plant Area |
108,000
ft2
|
Annual Production | 2,600
pieces
|
Production Hrs. Annual | 3,250
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $131,477 | 2,007,620 |
kWh
|
$0.065 |
Natural Gas | $66,620 | 24,033 |
MMBtu
|
$2.77 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $8,220 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,592 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $5,107 | $24,322 |
$(-2,610.0)
(-39,859)
kWh
|
$7,717
-
MMBtu
|
- | |
02 | 2.4314: Use synthetic lubricant | $1,151 | $1,978 |
$1,151
17,585
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $844 | $3,966 |
$844
12,896
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $198 | $300 |
$134
2,052
kWh
|
- | $64 | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $172 | $192 |
$77
1,172
kWh
|
- | $95 | |
06 | 2.4221: Install compressor air intakes in coolest locations | $518 | $577 |
$518
7,913
kWh
|
- | - | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $230 | $180 |
$230
3,517
kWh
|
- | - | |
TOTAL RECOMMENDED | $8,220 | $31,515 |
$344
5,276
kWh
|
$7,717
-
MMBtu
|
$159 | ||
TOTAL IMPLEMENTED | $1,592 | $4,723 |
$1,592
24,326
kWh
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs