ITAC Assessment: KU0416
ITAC logo
ITAC Assessment: KU0416
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product wire, rods, rivets, bolts
NAICS
n/a
SIC 3315: Steel Wiredrawing and Steel Nails and Spikes
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area 108,800
ft2
Annual Production 40,000
ton
Production Hrs. Annual 5,250
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $202,392 3,884,525
kWh
Natural Gas $90,642 31,206
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,442 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,442

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4314: Use synthetic lubricant $5,574 $25,882 $5,574
106,975
kWh
- -
02 2.4133: Use most efficient type of electric motors $5,115 - $5,115
98,183
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $987 $640 $199
3,810
kWh
- $788
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $611 $450 $611
11,723
kWh
- -
05 2.4221: Install compressor air intakes in coolest locations $596 $137 $596
11,430
kWh
- -
06 2.2136: Install / repair insulation on steam lines $345 $809 - $345
-
MMBtu
-
07 2.2511: Insulate bare equipment $214 $1,209 $214
4,103
kWh
- -
TOTAL RECOMMENDED $13,442 $29,127 $12,309
236,224
kWh
$345
-
MMBtu
$788
TOTAL IMPLEMENTED $13,442 $29,127 $12,309
236,224
kWh
$345
-
MMBtu
$788
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs