Assessment Year | 1993 |
---|---|
Principal Product | Storage Tanks |
NAICS |
n/a
|
SIC | 3443: Fabricated Plate Work (Boiler Shops) |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
127,900
ft2
|
Annual Production | 9,500
ton
|
Production Hrs. Annual | 4,080
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $145,420 | 4,500,879 |
kWh
|
$0.032 |
Natural Gas | $39,068 | 14,508 |
MMBtu
|
$2.69 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $4,383 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,215 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $975 | $11,826 |
$975
30,188
kWh
|
|
02 | 2.7131: Add area lighting switches | $1,193 | $3,969 |
$1,193
36,928
kWh
|
|
03 | 2.4221: Install compressor air intakes in coolest locations | $1,240 | $429 |
$1,240
38,394
kWh
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $682 | $113 |
$682
21,102
kWh
|
|
05 | 2.4133: Use most efficient type of electric motors | $293 | $200 |
$293
9,086
kWh
|
|
TOTAL RECOMMENDED | $4,383 | $16,537 |
$4,383
135,698
kWh
|
||
TOTAL IMPLEMENTED | $2,215 | $742 |
$2,215
68,582
kWh
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs