ITAC Assessment: KU0413
ITAC logo
ITAC Assessment: KU0413
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Storage Tanks
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 127,900
ft2
Annual Production 9,500
ton
Production Hrs. Annual 4,080
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $145,420 4,500,879
kWh
Natural Gas $39,068 14,508
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,383 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,215

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $975 $11,826 $975
30,188
kWh
02 2.7131: Add area lighting switches $1,193 $3,969 $1,193
36,928
kWh
03 2.4221: Install compressor air intakes in coolest locations $1,240 $429 $1,240
38,394
kWh
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $682 $113 $682
21,102
kWh
05 2.4133: Use most efficient type of electric motors $293 $200 $293
9,086
kWh
TOTAL RECOMMENDED $4,383 $16,537 $4,383
135,698
kWh
TOTAL IMPLEMENTED $2,215 $742 $2,215
68,582
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs