| Assessment Year | 1993 |
|---|---|
| Principal Product | Storage Tanks |
| NAICS |
n/a
|
| SIC | 3443: Fabricated Plate Work (Boiler Shops) |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
127,900
ft2
|
| Annual Production | 9,500
ton
|
| Production Hrs. Annual | 4,080
hrs
|
| Location (State) | Kansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $145,420 | 4,500,879 |
kWh
|
$0.032 |
| Natural Gas | $39,068 | 14,508 |
MMBtu
|
$2.69 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $4,383 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $2,215 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $975 | $11,826 |
$975
30,188
kWh
|
|
| 02 | 2.7131: Add area lighting switches | $1,193 | $3,969 |
$1,193
36,928
kWh
|
|
| 03 | 2.4221: Install compressor air intakes in coolest locations | $1,240 | $429 |
$1,240
38,394
kWh
|
|
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $682 | $113 |
$682
21,102
kWh
|
|
| 05 | 2.4133: Use most efficient type of electric motors | $293 | $200 |
$293
9,086
kWh
|
|
| TOTAL RECOMMENDED | $4,383 | $16,537 |
$4,383
135,698
kWh
|
||
| TOTAL IMPLEMENTED | $2,215 | $742 |
$2,215
68,582
kWh
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs