Assessment Year | 1993 |
---|---|
Principal Product | STEAM SURFACE CONDENSERS |
NAICS |
n/a
|
SIC | 3443: Fabricated Plate Work (Boiler Shops) |
Sales Range | $10 M to 50M |
# of Employees | 45 |
Plant Area |
n/a
|
Annual Production | 12
pieces
|
Production Hrs. Annual | 5,304
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $36,754 | 430,246 |
kWh
|
$0.085 |
Natural Gas | $24,249 | 7,434 |
MMBtu
|
$3.26 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $7,098 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,873 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $2,544 | $3,855 |
$3,756
43,962
kWh
|
$(-1,212.0)
-
MMBtu
|
|
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $419 | $489 |
$501
5,862
kWh
|
$(-82.0)
-
MMBtu
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,454 | $135 |
$1,454
16,999
kWh
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $952 | $100 |
$952
11,137
kWh
|
- | |
05 | 2.7134: Use photocell controls | $1,077 | $210 |
$1,077
12,603
kWh
|
- | |
06 | 2.7135: Install occupancy sensors | $326 | $400 |
$326
3,810
kWh
|
- | |
07 | 2.7135: Install occupancy sensors | $326 | $389 |
$326
3,810
kWh
|
- | |
TOTAL RECOMMENDED | $7,098 | $5,578 |
$8,392
98,183
kWh
|
$(-1,294.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $1,873 | $624 |
$1,955
22,861
kWh
|
$(-82.0)
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs