ITAC Assessment: KU0400
ITAC logo
ITAC Assessment: KU0400
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product STEAM SURFACE CONDENSERS
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area
n/a
Annual Production 12
pieces
Production Hrs. Annual 5,304
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $36,754 430,246
kWh
Natural Gas $24,249 7,434
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,098 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,873

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,544 $3,855 $3,756
43,962
kWh
$(-1,212.0)
-
MMBtu
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $419 $489 $501
5,862
kWh
$(-82.0)
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,454 $135 $1,454
16,999
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $952 $100 $952
11,137
kWh
-
05 2.7134: Use photocell controls $1,077 $210 $1,077
12,603
kWh
-
06 2.7135: Install occupancy sensors $326 $400 $326
3,810
kWh
-
07 2.7135: Install occupancy sensors $326 $389 $326
3,810
kWh
-
TOTAL RECOMMENDED $7,098 $5,578 $8,392
98,183
kWh
$(-1,294.0)
-
MMBtu
TOTAL IMPLEMENTED $1,873 $624 $1,955
22,861
kWh
$(-82.0)
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs