ITAC Assessment: KU0396
ITAC logo
ITAC Assessment: KU0396
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product TACOS AND TORTILLAS
NAICS
n/a
SIC 2038: Frozen Specialties, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 240
Plant Area
n/a
Annual Production 15,000,000
lb
Production Hrs. Annual 5,460
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $104,526 2,635,991
kWh
Natural Gas $62,163 23,965
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,752 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,129

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings Primary Raw Material Savings
01 2.2437: Recover waste heat from equipment $15,571 $21,400 $(-1,104.0)
(-27,843)
kWh
$16,675
-
MMBtu
- -
02 2.1393: Use steam sparging or injections in place of indirect heating $6,812 $6,925 - $6,812
-
MMBtu
- -
03 2.2621: Modify refrigeration system to operate at a lower pressure $3,811 $10,000 $3,811
96,131
kWh
- - -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $3,274 $10,000 $4,590
115,768
kWh
$(-1,316.0)
-
MMBtu
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,545 $1,172 $2,545
34,877
kWh
- - -
07 3.4154: Eliminate leaks in water lines and valves $1,065 $216 - - $130 $935
08 2.2437: Recover waste heat from equipment $422 $668 - $422
-
MMBtu
- -
09 2.7442: Keep doors and windows shut when not on use $252 - - $252
-
MMBtu
- -
TOTAL RECOMMENDED $33,752 $50,381 $9,842
218,933
kWh
$22,845
-
MMBtu
$130 $935
TOTAL IMPLEMENTED $8,129 $7,141 - $7,064
-
MMBtu
$130 $935
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs