Assessment Year | 1993 |
---|---|
Principal Product | TACOS AND TORTILLAS |
NAICS |
n/a
|
SIC | 2038: Frozen Specialties, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 240 |
Plant Area |
n/a
|
Annual Production | 15,000,000
lb
|
Production Hrs. Annual | 5,460
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $104,526 | 2,635,991 |
kWh
|
$0.040 |
Natural Gas | $62,163 | 23,965 |
MMBtu
|
$2.59 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $33,752 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,129 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $15,571 | $21,400 |
$(-1,104.0)
(-27,843)
kWh
|
$16,675
-
MMBtu
|
- | - | |
02 | 2.1393: Use steam sparging or injections in place of indirect heating | $6,812 | $6,925 | - |
$6,812
-
MMBtu
|
- | - | |
03 | 2.2621: Modify refrigeration system to operate at a lower pressure | $3,811 | $10,000 |
$3,811
96,131
kWh
|
- | - | - | |
04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $3,274 | $10,000 |
$4,590
115,768
kWh
|
$(-1,316.0)
-
MMBtu
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,545 | $1,172 |
$2,545
34,877
kWh
|
- | - | - | |
07 | 3.4154: Eliminate leaks in water lines and valves | $1,065 | $216 | - | - | $130 | $935 | |
08 | 2.2437: Recover waste heat from equipment | $422 | $668 | - |
$422
-
MMBtu
|
- | - | |
09 | 2.7442: Keep doors and windows shut when not on use | $252 | - | - |
$252
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $33,752 | $50,381 |
$9,842
218,933
kWh
|
$22,845
-
MMBtu
|
$130 | $935 | ||
TOTAL IMPLEMENTED | $8,129 | $7,141 | - |
$7,064
-
MMBtu
|
$130 | $935 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs