Assessment Year | 1997 |
---|---|
Principal Product | Sports Equipment |
NAICS |
n/a
|
SIC | 3949: Sporting and Athletic Goods, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 250 |
Plant Area |
500,000
ft2
|
Annual Production | 1,825,000
pieces
|
Production Hrs. Annual | 3,332
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $624,242 | 9,015,534 |
kWh
|
$0.069 |
Electricity Demand | $24,858 | 24,858 |
kW-mo/yr
|
$1.00 |
Electricity Fees | $53,155 | - |
|
- |
Natural Gas | $36,011 | 6,043 |
MMBtu
|
$5.96 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $118,252 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $27,551 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Solid Waste (haz) Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,219 | - |
$3,059
62,134
kWh
|
$160
-
kW-mo/yr
|
- | - | - | - | - | |
02 | 2.4314: Use synthetic lubricant | $2,789 | $1,625 |
$2,468
50,117
kWh
|
$133
-
kW-mo/yr
|
- |
$21
-
gal
|
- | - | $167 | |
03 | 2.7232: Replace existing hvac unit with high efficiency model | $12,704 | $21,700 |
$11,408
231,536
kWh
|
$1,296
-
kW-mo/yr
|
- | - | - | - | - | |
04 | 2.2622: Replace existing chiller with high efficiency model | $4,699 | $3,600 |
$4,278
86,753
kWh
|
$421
-
kW-mo/yr
|
- | - | - | - | - | |
05 | 2.7111: Reduce illumination to minimum necessary levels | $319 | - |
$270
5,569
kWh
|
$49
-
kW-mo/yr
|
- | - | - | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $779 | $1,680 |
$739
14,947
kWh
|
$40
-
kW-mo/yr
|
- | - | - | - | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,006 | $180 |
$2,635
53,341
kWh
|
$371
-
kW-mo/yr
|
- | - | - | - | - | |
08 | 2.7135: Install occupancy sensors | $5,740 | $12,300 |
$5,426
110,199
kWh
|
$314
-
kW-mo/yr
|
- | - | - | - | - | |
09 | 2.4133: Use most efficient type of electric motors | $6,494 | $13,387 |
$5,539
112,251
kWh
|
$955
-
kW-mo/yr
|
- | - | - | - | - | |
10 | 3.4112: Recovery metals from rinse water(evap., ion exchange, ro, electrolysis, electrodialysis) and reuse rinse water | $1,093 | $779 | - | - |
$1,093
-
Tgal
|
- | - | - | - | |
11 | 3.5146: Utilize a central coolant system for cleaning and reuse of metal working fluid | $17,366 | $4,500 | - | - |
$31
-
Tgal
|
$4,080
-
gal
|
- | - | $13,255 | |
12 | 3.8314: Purchase high materials in returnable bulk containers | $58,584 | $15,000 | - | - | - | - |
$54,912
-
lb
|
- | $3,672 | |
13 | 4.811: Demolish old building to reduce tax and insurance bills | $1,460 | $50 | - | - | - | - | - | $1,460 | - | |
TOTAL RECOMMENDED | $118,252 | $74,801 |
$35,822
726,847
kWh
|
$3,739
-
kW-mo/yr
|
$1,124
-
Tgal
|
$4,101
-
gal
|
$54,912
-
lb
|
$1,460 | $17,094 | ||
TOTAL IMPLEMENTED | $27,551 | $38,622 |
$23,059
467,761
kWh
|
$2,844
-
kW-mo/yr
|
- |
$21
-
gal
|
- | $1,460 | $167 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Solid Waste (haz) Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs