Assessment Year | 1993 |
---|---|
Principal Product | BIB OVERALLS |
NAICS |
n/a
|
SIC | 2326: Men's and Boys' Work Clothing |
Sales Range | $5 M to 10M |
# of Employees | 132 |
Plant Area |
n/a
|
Annual Production | 377,000
pieces
|
Production Hrs. Annual | 1,920
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $54,856 | 503,810 |
kWh
|
$0.11 |
Natural Gas | $4,311 | 946 |
MMBtu
|
$4.56 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $9,241 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,130 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
02 | 2.7261: Install timers and/or thermostats | $3,692 | $4,410 |
$3,542
32,532
kWh
|
$150
-
MMBtu
|
- | |
03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $2,070 | $1,281 |
$2,521
23,154
kWh
|
$(-451.0)
-
MMBtu
|
- | |
04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,732 | $1,316 |
$2,106
19,343
kWh
|
$(-374.0)
-
MMBtu
|
- | |
05 | 2.7135: Install occupancy sensors | $1,181 | $1,200 |
$1,181
10,844
kWh
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $46 | - |
$135
1,172
kWh
|
- | $(-89.0) | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $128 | $350 |
$128
1,172
kWh
|
- | - | |
08 | 2.2135: Repair and eliminate steam leaks | $292 | $70 | - |
$292
-
MMBtu
|
- | |
09 | 2.2136: Install / repair insulation on steam lines | $100 | $88 | - |
$100
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $9,241 | $8,715 |
$9,613
88,217
kWh
|
$(-283.0)
-
MMBtu
|
$(-89.0) | ||
TOTAL IMPLEMENTED | $4,130 | $4,568 |
$3,677
33,704
kWh
|
$542
-
MMBtu
|
$(-89.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs