ITAC Assessment: OR0513
ITAC logo
ITAC Assessment: OR0513
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Packaging equipment
NAICS 333993: Packaging Machinery Manufacturing
SIC 3565: Packaging Machinery
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 110,000
ft2
Annual Production 315
pieces
Production Hrs. Annual 4,368
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $119,150 1,767,360
kWh
Natural Gas $22,924 2,126
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,400 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,700

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.2533: Replace air curtain doors with solid doors $13,700 $5,000 $13,700
1,370
kWh
02 2.7134: Use photocell controls $5,900 $8,000 $5,900
230
kWh
03 2.6218: Turn off equipment when not in use $1,800 $300 $1,800
106
kWh
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,700 $1,700 $1,700
468
kWh
05 2.4133: Use most efficient type of electric motors $1,300 $800 $1,300
70
kWh
TOTAL RECOMMENDED $24,400 $15,800 $24,400
2,244
kWh
TOTAL IMPLEMENTED $16,700 $7,500 $16,700
1,908
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs