ITAC Assessment: KU0389
ITAC logo
ITAC Assessment: KU0389
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product METALIZED NYLON BALLOONS
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 106
Plant Area
n/a
Annual Production 25,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $134,430 1,961,899
kWh
Natural Gas $17,087 4,017
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,460 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,711

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.6121: Reduce hot water temperature to the minimum required $12,201 - $201
2,931
kWh
- $12,000
02 2.7111: Reduce illumination to minimum necessary levels $11,934 - $11,486
167,644
kWh
- $448
03 2.6232: Install set-back timers $1,546 $1,000 $1,546
22,567
kWh
- -
04 2.6121: Reduce hot water temperature to the minimum required $2,964 $2,250 $2,964
43,376
kWh
- -
05 2.2443: Re-use or recycle hot or cold process exhaust air $2,491 $4,158 - $2,491
-
MMBtu
-
06 2.3191: Use demand controller or load shedder $2,077 $4,000 $2,077
-
kWh
- -
07 2.4322: Use or replace with energy efficient substitutes $962 - $823
12,016
kWh
- $139
08 2.2511: Insulate bare equipment $984 $1,336 $984
14,361
kWh
- -
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $886 $1,050 $886
12,896
kWh
- -
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $813 $120 $813
12,016
kWh
- -
11 2.4221: Install compressor air intakes in coolest locations $602 $220 $602
8,792
kWh
- -
TOTAL RECOMMENDED $37,460 $14,134 $22,382
296,599
kWh
$2,491
-
MMBtu
$12,587
TOTAL IMPLEMENTED $16,711 $3,250 $4,711
68,874
kWh
- $12,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs