Assessment Year | 1992 |
---|---|
Principal Product | HYDRAULIC HOSE |
NAICS |
n/a
|
SIC | 3052: Rubber and Plastics Hose and Belting |
Sales Range | $10 M to 50M |
# of Employees | 300 |
Plant Area |
n/a
|
Annual Production | 50,000
thousand feet
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $687,976 | 16,185,815 |
kWh
|
$0.043 |
Natural Gas | $163,837 | 64,562 |
MMBtu
|
$2.54 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $44,798 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $31,288 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $4,084 | - |
$2,320
54,513
kWh
|
- | $1,764 | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $15,585 | $25,288 |
$15,585
366,354
kWh
|
- | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $6,093 | $6,720 |
$6,093
143,025
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,155 | - |
$9,181
216,002
kWh
|
- | $(-2,026.0) | |
05 | 2.6232: Install set-back timers | $2,455 | $1,200 |
$2,455
57,737
kWh
|
- | - | |
06 | 2.4133: Use most efficient type of electric motors | $594 | $2,083 |
$594
14,068
kWh
|
- | - | |
07 | 2.2414: Use waste heat from hot flue gases to preheat | $3,617 | $10,950 | - |
$3,617
-
MMBtu
|
- | |
08 | 2.7226: Use computer programs to optimize hvac performance | $2,205 | $7,500 |
$2,205
51,876
kWh
|
- | - | |
09 | 2.7242: Change zone reheat coils to variable air volume boxes | $3,010 | $13,866 | - |
$3,010
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $44,798 | $67,607 |
$38,433
903,575
kWh
|
$6,627
-
MMBtu
|
$(-262.0) | ||
TOTAL IMPLEMENTED | $31,288 | $33,208 |
$33,314
783,118
kWh
|
- | $(-2,026.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs