Assessment Year | 1992 |
---|---|
Principal Product | GIFT WRAP GRAVURE PRINT |
NAICS |
n/a
|
SIC | 2754: Commercial Printing, Gravure |
Sales Range | $100 M to 500M |
# of Employees | 220 |
Plant Area |
n/a
|
Annual Production | 1,179,320
pieces
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $555,854 | 13,045,135 |
kWh
|
$0.043 |
Natural Gas | $235,212 | 120,622 |
MMBtu
|
$1.95 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $43,919 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,372 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2443: Re-use or recycle hot or cold process exhaust air | $11,070 | $61,560 |
$(-2,808.0)
(-65,944)
kWh
|
$13,878
-
MMBtu
|
|
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $7,467 | $22,400 |
$7,467
175,557
kWh
|
- | |
03 | 2.7226: Use computer programs to optimize hvac performance | $7,388 | $45,000 |
$7,388
173,505
kWh
|
- | |
04 | 2.7229: Air condition only space necessary | $6,390 | $34,000 |
$6,390
150,059
kWh
|
- | |
05 | 2.2437: Recover waste heat from equipment | $5,891 | $1,000 |
$(-37.0)
(-879)
kWh
|
$5,928
-
MMBtu
|
|
06 | 2.2414: Use waste heat from hot flue gases to preheat | $3,760 | $20,620 | - |
$3,760
-
MMBtu
|
|
07 | 2.2136: Install / repair insulation on steam lines | $517 | $150 | - |
$517
-
MMBtu
|
|
08 | 2.6232: Install set-back timers | $1,099 | $1,050 |
$1,099
25,791
kWh
|
- | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $175 | $1,471 |
$175
4,103
kWh
|
- | |
10 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $162 | $600 |
$162
3,810
kWh
|
- | |
TOTAL RECOMMENDED | $43,919 | $187,851 |
$19,836
466,002
kWh
|
$24,083
-
MMBtu
|
||
TOTAL IMPLEMENTED | $15,372 | $67,550 |
$14,855
349,062
kWh
|
$517
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs