ITAC Assessment: KU0379
ITAC logo
ITAC Assessment: KU0379
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product GIFT WRAP GRAVURE PRINT
NAICS
n/a
SIC 2754: Commercial Printing, Gravure
Sales Range $100
M
to 500
M
# of Employees 220
Plant Area
n/a
Annual Production 1,179,320
pieces
Production Hrs. Annual 6,120
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $555,854 13,045,135
kWh
Natural Gas $235,212 120,622
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,919 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,372

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2443: Re-use or recycle hot or cold process exhaust air $11,070 $61,560 $(-2,808.0)
(-65,944)
kWh
$13,878
-
MMBtu
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $7,467 $22,400 $7,467
175,557
kWh
-
03 2.7226: Use computer programs to optimize hvac performance $7,388 $45,000 $7,388
173,505
kWh
-
04 2.7229: Air condition only space necessary $6,390 $34,000 $6,390
150,059
kWh
-
05 2.2437: Recover waste heat from equipment $5,891 $1,000 $(-37.0)
(-879)
kWh
$5,928
-
MMBtu
06 2.2414: Use waste heat from hot flue gases to preheat $3,760 $20,620 - $3,760
-
MMBtu
07 2.2136: Install / repair insulation on steam lines $517 $150 - $517
-
MMBtu
08 2.6232: Install set-back timers $1,099 $1,050 $1,099
25,791
kWh
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $175 $1,471 $175
4,103
kWh
-
10 2.2614: Use cooling tower or economizer to replace chiller cooling $162 $600 $162
3,810
kWh
-
TOTAL RECOMMENDED $43,919 $187,851 $19,836
466,002
kWh
$24,083
-
MMBtu
TOTAL IMPLEMENTED $15,372 $67,550 $14,855
349,062
kWh
$517
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs