Assessment Year | 1992 |
---|---|
Principal Product | CORRUGATED CONTAINERS |
NAICS |
n/a
|
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | $10 M to 50M |
# of Employees | 345 |
Plant Area |
n/a
|
Annual Production | 60,000
thousand feet
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $283,766 | 6,375,733 |
kWh
|
$0.045 |
Fuel Oil #2 | $151,800 | 2,587,200 |
MMBtu
|
$0.059 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $92,208 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $36,956 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Energy Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3132: Recharge batteries on during off-peak demand periods | $16,889 | $6,000 |
$16,889
-
kWh
|
- | - | - | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $6,930 | $48,000 |
$6,930
-
kWh
|
- | - | - | |
03 | 2.4133: Use most efficient type of electric motors | $16,293 | - |
$10,002
224,795
kWh
|
- | - | $6,291 | |
04 | 2.4133: Use most efficient type of electric motors | $7,251 | - |
$6,819
153,283
kWh
|
- | - | $432 | |
05 | 2.2437: Recover waste heat from equipment | $11,366 | $90,000 | - |
$11,366
-
MMBtu
|
- | - | |
06 | 2.4323: Use optimum size and capacity equipment | $7,694 | - | - |
$7,694
-
MMBtu
|
- | - | |
07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $4,699 | - | - |
$5,499
-
MMBtu
|
- | $(-800.0) | |
08 | 2.2414: Use waste heat from hot flue gases to preheat | $2,481 | - | - |
$2,610
-
MMBtu
|
- | $(-129.0) | |
09 | 2.1222: Install turbulators | $1,195 | $1,087 | - |
$1,195
-
MMBtu
|
- | - | |
10 | 2.8223: Add air shields to trucks to increase fuel mileage | $2,876 | $8,000 | - | - |
$2,876
-
MMBtu
|
- | |
11 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,686 | $30,000 |
$5,686
127,784
kWh
|
- | - | - | |
12 | 2.2511: Insulate bare equipment | $4,572 | $3,450 | - |
$4,572
-
MMBtu
|
- | - | |
13 | 2.2122: Install / repair insulation on condensate lines | $520 | $185 | - |
$520
-
MMBtu
|
- | - | |
14 | 2.4221: Install compressor air intakes in coolest locations | $1,826 | $3,200 |
$1,826
41,032
kWh
|
- | - | - | |
15 | 2.2135: Repair and eliminate steam leaks | $1,201 | $120 | - |
$1,201
-
MMBtu
|
- | - | |
16 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $721 | $2,550 |
$978
21,981
kWh
|
$(-257.0)
-
MMBtu
|
- | - | |
17 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8 | $420 |
$52
1,172
kWh
|
- | - | $(-44.0) | |
TOTAL RECOMMENDED | $92,208 | $193,012 |
$49,182
570,047
kWh
|
$34,400
-
MMBtu
|
$2,876
-
MMBtu
|
$5,750 | ||
TOTAL IMPLEMENTED | $36,956 | $33,320 |
$24,333
546,894
kWh
|
$6,700
-
MMBtu
|
- | $5,923 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Energy Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs