Assessment Year | 1992 |
---|---|
Principal Product | INSTANT TEA |
NAICS |
n/a
|
SIC | 2087: Flavoring Extracts and Flavoring Syrups, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 40 |
Plant Area |
n/a
|
Annual Production | 4,800,000
lb
|
Production Hrs. Annual | 5,592
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $839,433 | 18,896,249 |
kWh
|
$0.044 |
Natural Gas | $801,358 | 318,063 |
MMBtu
|
$2.52 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $439,192 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $74,237 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2627: Use multiple-effect evaporators | $133,326 | $720,000 | - |
$133,326
-
MMBtu
|
- | |
02 | 3.6192: Use a less expensive method of waste removal | $91,322 | - |
$990
22,274
kWh
|
- | $90,332 | |
03 | 2.4322: Use or replace with energy efficient substitutes | $46,997 | $208,233 |
$26,678
600,528
kWh
|
$20,319
-
MMBtu
|
- | |
04 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $35,349 | $117,700 |
$35,349
795,721
kWh
|
- | - | |
05 | 2.2414: Use waste heat from hot flue gases to preheat | $29,723 | $39,435 | - |
$29,723
-
MMBtu
|
- | |
06 | 2.2444: Use hot process fluids to preheat incoming process fluids | $32,127 | $90,000 | - |
$32,127
-
MMBtu
|
- | |
07 | 2.2113: Repair or replace steam traps | $29,914 | - | - |
$25,787
-
MMBtu
|
$4,127 | |
08 | 2.2135: Repair and eliminate steam leaks | $5,325 | $670 | - |
$5,325
-
MMBtu
|
- | |
09 | 2.4133: Use most efficient type of electric motors | $3,789 | $10,400 |
$3,789
85,287
kWh
|
- | - | |
10 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $17,785 | $70,400 |
$17,785
400,352
kWh
|
- | - | |
11 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $6,367 | $8,000 |
$6,367
143,318
kWh
|
- | - | |
12 | 2.7261: Install timers and/or thermostats | $4,086 | - |
$2,357
53,048
kWh
|
$1,729
-
MMBtu
|
- | |
13 | 2.2511: Insulate bare equipment | $3,082 | $10,685 | - |
$3,082
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $439,192 | $1,275,523 |
$93,315
2,100,528
kWh
|
$251,418
-
MMBtu
|
$94,459 | ||
TOTAL IMPLEMENTED | $74,237 | $111,755 |
$3,789
85,287
kWh
|
$66,321
-
MMBtu
|
$4,127 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs