ITAC Assessment: KU0370
ITAC logo
ITAC Assessment: KU0370
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product CONTROL DAMPERS
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 108
Plant Area
n/a
Annual Production 23,100
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $63,895 1,088,804
kWh
Natural Gas $18,762 4,805
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,517 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,216

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7441: Replace broken windows and/or window sash $2,059 $2,670 - $2,059
-
MMBtu
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,376 $1,450 $1,376
23,447
kWh
- -
03 2.2437: Recover waste heat from equipment $527 - - $527
-
MMBtu
-
04 2.4239: Eliminate or reduce compressed air usage $313 $1,000 $313
5,275
kWh
- -
05 3.7214: Reduce or eliminate waste $999 - $189
3,224
kWh
- $810
06 2.7314: Reduce ventilation air $243 $650 $52
879
kWh
$191
-
MMBtu
-
TOTAL RECOMMENDED $5,517 $5,770 $1,930
32,825
kWh
$2,777
-
MMBtu
$810
TOTAL IMPLEMENTED $2,216 $2,450 $1,689
28,722
kWh
$527
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs