ITAC Assessment: KU0360
ITAC logo
ITAC Assessment: KU0360
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product PROCESSED CHEESE
NAICS
n/a
SIC 2022: Natural, Processed, and Imitation Cheese
Sales Range $50
M
to 100
M
# of Employees 220
Plant Area
n/a
Annual Production 60,000,000
lb
Production Hrs. Annual 4,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $193,395 3,755,569
kWh
Natural Gas $59,762 17,033
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,303 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2621: Modify refrigeration system to operate at a lower pressure $11,710 $6,000 $11,710
227,433
kWh
-
02 2.4322: Use or replace with energy efficient substitutes $7,473 $22,500 - $7,473
-
MMBtu
03 2.1233: Analyze flue gas for proper air/fuel ratio $1,987 $150 - $1,987
-
MMBtu
04 2.1123: Install automatic stack damper $1,794 $2,525 - $1,794
-
MMBtu
05 2.2522: Isolate hot or cold equipment $1,192 $300 $1,192
23,154
kWh
-
06 2.6232: Install set-back timers $770 $1,900 $770
14,947
kWh
-
07 2.4221: Install compressor air intakes in coolest locations $377 $310 $377
7,327
kWh
-
TOTAL RECOMMENDED $25,303 $33,685 $14,049
272,861
kWh
$11,254
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs