ITAC Assessment: KU0359
ITAC logo
ITAC Assessment: KU0359
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product STEERING COMPONENTS
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 97
Plant Area
n/a
Annual Production 3,700,000
pieces
Production Hrs. Annual 5,928
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $132,996 2,683,470
kWh
Natural Gas $24,830 6,114
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,414 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,414

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2443: Re-use or recycle hot or cold process exhaust air $1,092 $2,000 - $1,092
-
MMBtu
02 2.4231: Reduce the pressure of compressed air to the minimum required $747 $120 $747
14,947
kWh
-
03 2.2437: Recover waste heat from equipment $775 $1,250 $(-87.0)
(-1,758)
kWh
$862
-
MMBtu
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $678 - $678
13,775
kWh
-
05 2.7447: Install vinyl strip / high speed / air curtain doors $122 $150 - $122
-
MMBtu
TOTAL RECOMMENDED $3,414 $3,520 $1,338
26,964
kWh
$2,076
-
MMBtu
TOTAL IMPLEMENTED $3,414 $3,520 $1,338
26,964
kWh
$2,076
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs