ITAC Assessment: KU0358
ITAC logo
ITAC Assessment: KU0358
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product BEEF AND BEEF PRODUCTS
NAICS
n/a
SIC 2011: Meat Packing Plants
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 15,000,000
lb
Production Hrs. Annual 4,800
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $399,264 9,027,257
kWh
Natural Gas $54,975 18,109
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $84,731 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2623: Minimize condenser cooling water temperature $35,057 $12,000 $35,057
792,790
kWh
-
02 2.2623: Minimize condenser cooling water temperature $14,710 $12,800 $14,710
332,649
kWh
-
03 2.4322: Use or replace with energy efficient substitutes $15,900 $38,600 $15,900
382,181
kWh
-
04 2.2437: Recover waste heat from equipment $18,286 $39,000 - $18,286
-
MMBtu
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $622 - $622
14,068
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $156 $280 $156
3,517
kWh
-
TOTAL RECOMMENDED $84,731 $102,680 $66,445
1,525,205
kWh
$18,286
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs