ITAC Assessment: KU0355
ITAC logo
ITAC Assessment: KU0355
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product BEVERAGE & ALCOHOL PRODUCTS
NAICS
n/a
SIC 2085: Distilled and Blended Liquors
Sales Range $50
M
to 100
M
# of Employees 71
Plant Area
n/a
Annual Production 5,340
Tgal
Production Hrs. Annual 2,080
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,686 961,899
kWh
Natural Gas $40,512 9,857
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,377 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7221: Lower temperature during the winter season and vice-versa $8,740 $3,120 $2,661
38,980
kWh
$6,079
-
MMBtu
02 2.5194: Redesign process $2,417 $2,500 - $2,417
-
MMBtu
03 2.4231: Reduce the pressure of compressed air to the minimum required $700 $150 $700
10,258
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $220 $250 $220
3,224
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $300 $280 $300
4,396
kWh
-
TOTAL RECOMMENDED $12,377 $6,300 $3,881
56,858
kWh
$8,496
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs