Assessment Year | 1991 |
---|---|
Principal Product | AIR FILTER CANISTERS |
NAICS |
n/a
|
SIC | 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment |
Sales Range | $10 M to 50M |
# of Employees | 230 |
Plant Area |
n/a
|
Annual Production | 250,000
pieces
|
Production Hrs. Annual | 3,840
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $281,040 | 3,827,960 |
kWh
|
$0.073 |
Natural Gas | $93,985 | 31,927 |
MMBtu
|
$2.94 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $16,004 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,004 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.6232: Install set-back timers | $4,777 | $2,460 |
$4,777
65,064
kWh
|
- | - | |
02 | 2.7111: Reduce illumination to minimum necessary levels | $796 | $360 |
$796
10,844
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $409 | - |
$435
5,862
kWh
|
- | $(-26.0) | |
04 | 2.2437: Recover waste heat from equipment | $3,963 | $3,800 | - |
$3,963
-
MMBtu
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,658 | $500 |
$3,658
49,824
kWh
|
- | - | |
06 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,322 | - |
$1,592
21,688
kWh
|
$(-270.0)
-
MMBtu
|
- | |
07 | 2.1213: Direct warmest air to combustion intake | $735 | $2,200 | - |
$735
-
MMBtu
|
- | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $344 | - |
$344
4,689
kWh
|
- | - | |
TOTAL RECOMMENDED | $16,004 | $9,320 |
$11,602
157,971
kWh
|
$4,428
-
MMBtu
|
$(-26.0) | ||
TOTAL IMPLEMENTED | $16,004 | $9,320 |
$11,602
157,971
kWh
|
$4,428
-
MMBtu
|
$(-26.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs