ITAC Assessment: KU0350
ITAC logo
ITAC Assessment: KU0350
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product FARM TILLAGE EQUIPMENT
NAICS
n/a
SIC 3523: Farm Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 215
Plant Area
n/a
Annual Production 2,300
pieces
Production Hrs. Annual 3,856
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $250,684 4,947,538
kWh
Natural Gas $136,460 106,278
MMBtu
Other Energy $7,729 1,189
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,019 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $51,019

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Energy Savings Administrative Changes Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $36,079 - - $21,725
-
MMBtu
$4,634
-
MMBtu
$9,720
02 2.2414: Use waste heat from hot flue gases to preheat $1,101 $12,000 - $1,101
-
MMBtu
- -
03 2.7121: Utilize daylight whenever possible in lieu of artificial light $6,192 $7,440 $6,192
122,216
kWh
- - -
04 2.6232: Install set-back timers $995 $550 $995
19,637
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $550 $950 $550
10,844
kWh
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,198 $1,230 $5,198
102,579
kWh
- - -
07 2.2437: Recover waste heat from equipment $692 $450 - $692
-
MMBtu
- -
08 2.2514: Cover open tanks $212 $350 - $212
-
MMBtu
- -
TOTAL RECOMMENDED $51,019 $22,970 $12,935
255,276
kWh
$23,730
-
MMBtu
$4,634
-
MMBtu
$9,720
TOTAL IMPLEMENTED $51,019 $22,970 $12,935
255,276
kWh
$23,730
-
MMBtu
$4,634
-
MMBtu
$9,720
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Energy Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs