Assessment Year | 1991 |
---|---|
Principal Product | FARM TILLAGE EQUIPMENT |
NAICS |
n/a
|
SIC | 3523: Farm Machinery and Equipment |
Sales Range | $10 M to 50M |
# of Employees | 215 |
Plant Area |
n/a
|
Annual Production | 2,300
pieces
|
Production Hrs. Annual | 3,856
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $250,684 | 4,947,538 |
kWh
|
$0.051 |
Natural Gas | $136,460 | 106,278 |
MMBtu
|
$1.28 |
Other Energy | $7,729 | 1,189 |
MMBtu
|
$6.50 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $51,019 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $51,019 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Energy Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.6212: Turn off equipment during breaks, reduce operating time | $36,079 | - | - |
$21,725
-
MMBtu
|
$4,634
-
MMBtu
|
$9,720 | |
02 | 2.2414: Use waste heat from hot flue gases to preheat | $1,101 | $12,000 | - |
$1,101
-
MMBtu
|
- | - | |
03 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $6,192 | $7,440 |
$6,192
122,216
kWh
|
- | - | - | |
04 | 2.6232: Install set-back timers | $995 | $550 |
$995
19,637
kWh
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $550 | $950 |
$550
10,844
kWh
|
- | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,198 | $1,230 |
$5,198
102,579
kWh
|
- | - | - | |
07 | 2.2437: Recover waste heat from equipment | $692 | $450 | - |
$692
-
MMBtu
|
- | - | |
08 | 2.2514: Cover open tanks | $212 | $350 | - |
$212
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $51,019 | $22,970 |
$12,935
255,276
kWh
|
$23,730
-
MMBtu
|
$4,634
-
MMBtu
|
$9,720 | ||
TOTAL IMPLEMENTED | $51,019 | $22,970 |
$12,935
255,276
kWh
|
$23,730
-
MMBtu
|
$4,634
-
MMBtu
|
$9,720 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Energy Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs