Assessment Year | 1991 |
---|---|
Principal Product | SOFT DRINK BEVERAGES |
NAICS |
n/a
|
SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
Sales Range | $50 M to 100M |
# of Employees | 280 |
Plant Area |
n/a
|
Annual Production | 5,900,000
pieces
|
Production Hrs. Annual | 5,700
hrs
|
Location (State) | Nebraska |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $169,778 | 3,150,059 |
kWh
|
$0.054 |
Natural Gas | $53,017 | 14,940 |
MMBtu
|
$3.55 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $58,990 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2621: Modify refrigeration system to operate at a lower pressure | $17,274 | $25,000 |
$17,274
320,633
kWh
|
- | - | |
02 | 2.2437: Recover waste heat from equipment | $12,542 | $27,500 | - |
$12,542
-
MMBtu
|
- | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $8,337 | - |
$8,337
154,748
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,394 | $6,010 |
$10,394
168,816
kWh
|
- | - | |
05 | 2.4312: Improve lubrication practices | $3,537 | $4,945 |
$3,537
65,651
kWh
|
- | - | |
06 | 2.6232: Install set-back timers | $2,842 | $1,050 |
$2,842
52,755
kWh
|
- | - | |
07 | 2.4133: Use most efficient type of electric motors | $384 | $950 |
$384
7,034
kWh
|
- | - | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,100 | - |
$2,100
38,980
kWh
|
- | - | |
09 | 2.4221: Install compressor air intakes in coolest locations | $711 | $139 |
$711
13,189
kWh
|
- | - | |
10 | 2.2511: Insulate bare equipment | $628 | $1,006 | - |
$628
-
MMBtu
|
- | |
11 | 3.4154: Eliminate leaks in water lines and valves | $241 | - | - | - | $241 | |
TOTAL RECOMMENDED | $58,990 | $66,600 |
$45,579
821,806
kWh
|
$13,170
-
MMBtu
|
$241 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs