ITAC Assessment: KU0340
ITAC logo
ITAC Assessment: KU0340
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product COMMERCIAL REFRIGERATORS
NAICS
n/a
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area
n/a
Annual Production 9,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $98,122 1,816,823
kWh
Natural Gas $42,697 9,441
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,000 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $8,570 - - $8,570
-
MMBtu
02 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $7,689 $200 - $7,689
-
MMBtu
03 2.7314: Reduce ventilation air $6,174 $100 $2,359
43,669
kWh
$3,815
-
MMBtu
04 2.7314: Reduce ventilation air $1,042 $350 $491
9,086
kWh
$551
-
MMBtu
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,351 $900 $5,351
99,062
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $174 - $174
3,224
kWh
-
TOTAL RECOMMENDED $29,000 $1,550 $8,375
155,041
kWh
$20,625
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs