ITAC Assessment: KU0336
ITAC logo
ITAC Assessment: KU0336
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product IND. AIR COMPRESSORS
NAICS
n/a
SIC 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment
Sales Range $50
M
to 100
M
# of Employees 204
Plant Area
n/a
Annual Production 6,120
pieces
Production Hrs. Annual 5,712
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $387,993 7,465,416
kWh
Natural Gas $76,770 14,411
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $108,909 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $108,909

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2437: Recover waste heat from equipment $21,491 $19,500 - $21,491
-
MMBtu
-
02 2.7245: Use direct air supply to exhaust hoods $15,055 $18,000 $3,137
60,375
kWh
$11,918
-
MMBtu
-
03 2.7243: Improve air circulation with destratification fans / other methods $12,114 $27,600 $(-838.0)
(-16,120)
kWh
$12,952
-
MMBtu
-
04 2.2437: Recover waste heat from equipment $9,818 $3,800 - $9,818
-
MMBtu
-
05 2.6212: Turn off equipment during breaks, reduce operating time $22,099 $22,000 $22,099
425,264
kWh
- -
06 2.5194: Redesign process $10,585 $25,200 $10,585
145,076
kWh
- -
07 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $5,650 $17,100 $5,650
108,734
kWh
- -
08 2.3512: De-energize excess transformer capacity $1,112 - $1,112
21,395
kWh
- -
09 2.6232: Install set-back timers $899 $1,000 $899
17,292
kWh
- -
10 2.4111: Utilize energy-efficient belts and other improved mechanisms $366 - $366
7,034
kWh
- -
11 3.4115: Recover and reuse cooling water $9,720 $5,340 $(-990.0)
(-19,050)
kWh
- $10,710
TOTAL RECOMMENDED $108,909 $139,540 $42,020
750,000
kWh
$56,179
-
MMBtu
$10,710
TOTAL IMPLEMENTED $108,909 $139,540 $42,020
750,000
kWh
$56,179
-
MMBtu
$10,710
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs