ITAC Assessment: NC0221
ITAC logo
ITAC Assessment: NC0221
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Compression molded plastic parts
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area 30,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $158,276 1,899,920
kWh
LPG $10,425 908
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $100,849 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $96,073

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings LPG Savings Personnel Changes Savings Increase in Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $508 $455 $508
6,963
kWh
- - - - -
02 2.7134: Use photocell controls $484 $360 $484
6,624
kWh
- - - - -
03 2.8114: Change rate schedules or other changes in utility service $44,663 $500 - $66,263 - - $(-21,600.0) -
04 2.1332: Convert combustion equipment to burn natural gas $3,060 $8,000 - - $(-7,365.0)
-
MMBtu
$10,425
-
MMBtu
- -
05 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $4,292 $2,000 $4,292
42,036
kWh
- - - - -
06 2.1332: Convert combustion equipment to burn natural gas $47,842 $92,321 $25,808
353,100
kWh
- - $(-17,966.0)
-
MMBtu
- $40,000
TOTAL RECOMMENDED $100,849 $103,636 $31,092
408,723
kWh
$66,263 $(-7,365.0)
-
MMBtu
$(-7,541.0)
-
MMBtu
$(-21,600.0) $40,000
TOTAL IMPLEMENTED $96,073 $101,276 $26,316
360,063
kWh
$66,263 $(-7,365.0)
-
MMBtu
$(-7,541.0)
-
MMBtu
$(-21,600.0) $40,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings LPG Savings Personnel Changes Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs