Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product LIQUID BLEACH
NAICS
n/a
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 48
Plant Area
n/a
Annual Production 10,800
Tgal
Production Hrs. Annual 4,160
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $102,314 1,228,312
kWh
Natural Gas $26,358 5,521
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,632 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,362

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4239: Eliminate or reduce compressed air usage $5,883 $450 $5,883
70,633
kWh
- -
02 2.2437: Recover waste heat from equipment $1,633 $9,000 $(-732.0)
(-8,792)
kWh
$949
-
MMBtu
$1,416
03 2.6232: Install set-back timers $2,295 $520 $2,295
27,550
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $706 $520 $706
8,499
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $610 $100 $610
7,327
kWh
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $317 $100 $317
3,810
kWh
- -
07 2.7224: Reduce space conditioning during non-working hours $708 - $708
8,499
kWh
- -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $293 - $293
3,517
kWh
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $49 $30 $49
586
kWh
- -
10 2.6121: Reduce hot water temperature to the minimum required $138 - - $138
-
MMBtu
-
TOTAL RECOMMENDED $12,632 $10,720 $10,129
121,629
kWh
$1,087
-
MMBtu
$1,416
TOTAL IMPLEMENTED $8,362 $1,170 $8,224
98,768
kWh
$138
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs