| Assessment Year | 1990 |
|---|---|
| Principal Product | LIQUID BLEACH |
| NAICS |
n/a
|
| SIC | 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 48 |
| Plant Area |
n/a
|
| Annual Production | 10,800
Tgal
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $102,314 | 1,228,312 |
kWh
|
$0.083 |
| Natural Gas | $26,358 | 5,521 |
MMBtu
|
$4.77 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $12,632 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $8,362 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4239: Eliminate or reduce compressed air usage | $5,883 | $450 |
$5,883
70,633
kWh
|
- | - | |
| 02 | 2.2437: Recover waste heat from equipment | $1,633 | $9,000 |
$(-732.0)
(-8,792)
kWh
|
$949
-
MMBtu
|
$1,416 | |
| 03 | 2.6232: Install set-back timers | $2,295 | $520 |
$2,295
27,550
kWh
|
- | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $706 | $520 |
$706
8,499
kWh
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $610 | $100 |
$610
7,327
kWh
|
- | - | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $317 | $100 |
$317
3,810
kWh
|
- | - | |
| 07 | 2.7224: Reduce space conditioning during non-working hours | $708 | - |
$708
8,499
kWh
|
- | - | |
| 08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $293 | - |
$293
3,517
kWh
|
- | - | |
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $49 | $30 |
$49
586
kWh
|
- | - | |
| 10 | 2.6121: Reduce hot water temperature to the minimum required | $138 | - | - |
$138
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $12,632 | $10,720 |
$10,129
121,629
kWh
|
$1,087
-
MMBtu
|
$1,416 | ||
| TOTAL IMPLEMENTED | $8,362 | $1,170 |
$8,224
98,768
kWh
|
$138
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs