| Assessment Year | 1990 |
|---|---|
| Principal Product | TRUCK BED EQUIPMENT |
| NAICS |
n/a
|
| SIC | 3713: Truck and Bus Bodies |
| Sales Range | $10 M to 50M |
| # of Employees | 180 |
| Plant Area |
n/a
|
| Annual Production | 5,000
pieces
|
| Production Hrs. Annual | 6,864
hrs
|
| Location (State) | Iowa |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $124,889 | 1,759,965 |
kWh
|
$0.071 |
| Natural Gas | $55,553 | 14,824 |
MMBtu
|
$3.75 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $11,579 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $9,895 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4239: Eliminate or reduce compressed air usage | $1,684 | $2,597 |
$1,684
23,740
kWh
|
- | - | |
| 02 | 2.2532: Use only amount of air necessary to prevent explosion hazard | $6,698 | $1,200 |
$1,268
17,878
kWh
|
$5,430
-
MMBtu
|
- | |
| 03 | 2.7261: Install timers and/or thermostats | $604 | $400 |
$270
3,810
kWh
|
$334
-
MMBtu
|
- | |
| 04 | 2.7229: Air condition only space necessary | $168 | $400 |
$104
1,465
kWh
|
$64
-
MMBtu
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $468 | $360 |
$372
5,275
kWh
|
- | $96 | |
| 06 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $832 | $487 |
$832
11,723
kWh
|
- | - | |
| 07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,125 | - | - |
$1,125
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $11,579 | $5,444 |
$4,530
63,891
kWh
|
$6,953
-
MMBtu
|
$96 | ||
| TOTAL IMPLEMENTED | $9,895 | $2,847 |
$2,846
40,151
kWh
|
$6,953
-
MMBtu
|
$96 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs