ITAC Assessment: KU0319
ITAC logo
ITAC Assessment: KU0319
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product TRUCK BED EQUIPMENT
NAICS
n/a
SIC 3713: Truck and Bus Bodies
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area
n/a
Annual Production 5,000
pieces
Production Hrs. Annual 6,864
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $124,889 1,759,965
kWh
Natural Gas $55,553 14,824
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,579 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,895

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4239: Eliminate or reduce compressed air usage $1,684 $2,597 $1,684
23,740
kWh
- -
02 2.2532: Use only amount of air necessary to prevent explosion hazard $6,698 $1,200 $1,268
17,878
kWh
$5,430
-
MMBtu
-
03 2.7261: Install timers and/or thermostats $604 $400 $270
3,810
kWh
$334
-
MMBtu
-
04 2.7229: Air condition only space necessary $168 $400 $104
1,465
kWh
$64
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $468 $360 $372
5,275
kWh
- $96
06 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $832 $487 $832
11,723
kWh
- -
07 2.1233: Analyze flue gas for proper air/fuel ratio $1,125 - - $1,125
-
MMBtu
-
TOTAL RECOMMENDED $11,579 $5,444 $4,530
63,891
kWh
$6,953
-
MMBtu
$96
TOTAL IMPLEMENTED $9,895 $2,847 $2,846
40,151
kWh
$6,953
-
MMBtu
$96
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs