ITAC Assessment: KU0315
ITAC logo
ITAC Assessment: KU0315
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product CORN CHIPS
NAICS
n/a
SIC 2096: Potato Chips, Corn Chips, and Similar Snacks
Sales Range $10
M
to 50
M
# of Employees 77
Plant Area
n/a
Annual Production 18,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $77,113 1,579,132
kWh
Natural Gas $155,513 62,792
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,915 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,397

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 3.4115: Recover and reuse cooling water $4,123 $7,000 - - $4,123
02 2.7142: Utilize higher efficiency lamps and/or ballasts $862 $100 $862
17,585
kWh
- -
03 2.6232: Install set-back timers $1,130 $640 $1,130
23,154
kWh
- -
04 2.3212: Optimize plant power factor $518 $900 $518
-
kWh
- -
05 2.7224: Reduce space conditioning during non-working hours $1,282 $100 - $1,282
-
MMBtu
-
TOTAL RECOMMENDED $7,915 $8,740 $2,510
40,739
kWh
$1,282
-
MMBtu
$4,123
TOTAL IMPLEMENTED $7,397 $7,840 $1,992
40,739
kWh
$1,282
-
MMBtu
$4,123
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs