ITAC Assessment: OR0656
ITAC logo
ITAC Assessment: OR0656
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Dairy Products
NAICS 311511: Fluid Milk Manufacturing
SIC 2022: Natural, Processed, and Imitation Cheese
Sales Range greater than $500
M
# of Employees 350
Plant Area 339,010
ft2
Annual Production 10,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,904,432 69,697,616
kWh
Electricity Demand $574,056 123,258
kW-mo/yr
Electricity Fees $18,600 -
LPG $10 1
MMBtu
Other Energy $593,657 32,805
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,839,866 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,522,480

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Other Energy Savings Administrative Changes Savings Ancillary Material Cost Savings Increase in Production Savings
01 4.652: Replace existing equipment with more suitable substitutes $2,308,919 $1,300,000 - - - - - - $2,308,919
02 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $188,688 $247,000 - - $188,688
-
MMBtu
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $17,591 $27,789 $14,176
337,526
kWh
$2,202
-
kW-mo/yr
- - $509 $704 -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $317,386 - $1,577,843
38,112,145
kWh
- $(-1,882,768.0)
-
MMBtu
$622,311
-
MMBtu
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $7,282 $22,500 $6,314
150,334
kWh
$968
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $2,839,866 $1,597,289 $1,598,333
38,600,005
kWh
$3,170
-
kW-mo/yr
$(-1,694,080.0)
-
MMBtu
$622,311
-
MMBtu
$509 $704 $2,308,919
TOTAL IMPLEMENTED $2,522,480 $1,597,289 $20,490
487,860
kWh
$3,170
-
kW-mo/yr
$188,688
-
MMBtu
- $509 $704 $2,308,919