ITAC Assessment: KU0314
ITAC logo
ITAC Assessment: KU0314
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product PROCESSED MEATS
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area
n/a
Annual Production 47,000,000
lb
Production Hrs. Annual 4,576
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $657,538 11,323,857
kWh
Natural Gas $143,155 55,892
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,834 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,848

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $532 $600 $532
9,086
kWh
- -
02 2.2121: Increase amount of condensate returned $20,739 $22,000 - $4,828
-
MMBtu
$15,911
03 2.1233: Analyze flue gas for proper air/fuel ratio $538 - - $1,178
-
MMBtu
$(-640.0)
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,014 $1,587 $1,014
17,585
kWh
- -
05 3.4115: Recover and reuse cooling water $5,719 $2,000 - - $5,719
06 2.4231: Reduce the pressure of compressed air to the minimum required $986 $40 $986
16,999
kWh
- -
07 2.4221: Install compressor air intakes in coolest locations $306 $150 $306
5,275
kWh
- -
TOTAL RECOMMENDED $29,834 $26,377 $2,838
48,945
kWh
$6,006
-
MMBtu
$20,990
TOTAL IMPLEMENTED $28,848 $26,337 $1,852
31,946
kWh
$6,006
-
MMBtu
$20,990
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs