ITAC Assessment: TT0265
ITAC logo
ITAC Assessment: TT0265
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Tungsten Scrap
NAICS 331492: Secondary Smelting, Refining, and Alloying of Nonferrous Metal (except Copper and Aluminum)
SIC 3399: Primary Metal Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 42
Plant Area 63,000
ft2
Annual Production 8,000,000
lb
Production Hrs. Annual 2,625
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $72,711 820,929
kWh
Electricity Demand $24,782 4,287
kW-mo/yr
Natural Gas $69,695 12,970
MMBtu
Waste Disposal Costs
Water Usage $4,198 366
Tgal
TOTAL YEARLY COSTS $171,386
RECOMMENDED SAVINGS* $22,768 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,587

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $12,477 $2,065 - - $12,477
-
MMBtu
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,704 $9,000 $7,016
79,214
kWh
$1,688
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,587 $3,967 $1,318
14,881
kWh
$269
-
kW-mo/yr
-
TOTAL RECOMMENDED $22,768 $15,032 $8,334
94,094
kWh
$1,957
-
kW-mo/yr
$12,477
-
MMBtu
TOTAL IMPLEMENTED $1,587 $3,967 $1,318
14,881
kWh
$269
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs