Assessment Year | 2022 |
---|---|
Principal Product | Tungsten Scrap |
NAICS | 331492: Secondary Smelting, Refining, and Alloying of Nonferrous Metal (except Copper and Aluminum) |
SIC | 3399: Primary Metal Products, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 42 |
Plant Area |
63,000
ft2
|
Annual Production | 8,000,000
lb
|
Production Hrs. Annual | 2,625
hrs
|
Location (State) | Kentucky |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $72,711 | 820,929 |
kWh
|
$0.089 | |
Electricity Demand | $24,782 | 4,287 |
kW-mo/yr
|
$5.78 | |
Natural Gas | $69,695 | 12,970 |
MMBtu
|
$5.37 | |
Waste Disposal Costs | |||||
Water Usage | $4,198 | 366 |
Tgal
|
$11.47 | |
TOTAL YEARLY COSTS | $171,386 | ||||
RECOMMENDED SAVINGS* | $22,768 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $1,587 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $12,477 | $2,065 | - | - |
$12,477
-
MMBtu
|
|
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,704 | $9,000 |
$7,016
79,214
kWh
|
$1,688
-
kW-mo/yr
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,587 | $3,967 |
$1,318
14,881
kWh
|
$269
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $22,768 | $15,032 |
$8,334
94,094
kWh
|
$1,957
-
kW-mo/yr
|
$12,477
-
MMBtu
|
||
TOTAL IMPLEMENTED | $1,587 | $3,967 |
$1,318
14,881
kWh
|
$269
-
kW-mo/yr
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs