ITAC Assessment: KU0309
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product HOMOGINIZED MILK & O.J.
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range $10
M
to 50
M
# of Employees 225
Plant Area
n/a
Annual Production 22,000
Tgal
Production Hrs. Annual 7,488
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $503,333 8,776,378
kWh
Natural Gas $99,370 37,089
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $63,543 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,985

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $20,546 $12,840 $20,546
358,441
kWh
- -
02 2.7263: Lower compressor pressure through a/c system modification $10,130 $10,000 $10,130
176,729
kWh
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,042 $4,000 $1,042
18,171
kWh
- -
04 3.4113: Treat and reuse rinse waters $5,895 $4,000 - - $5,895
05 2.2511: Insulate bare equipment $386 $300 $386
6,741
kWh
- -
06 2.1131: Repair faulty insulation in furnaces, boilers, etc $126 $180 - $126
-
MMBtu
-
07 2.2621: Modify refrigeration system to operate at a lower pressure $22,428 $20,000 $22,428
391,266
kWh
- -
08 2.4133: Use most efficient type of electric motors $2,990 $2,400 $2,990
52,169
kWh
- -
TOTAL RECOMMENDED $63,543 $53,720 $57,522
1,003,517
kWh
$126
-
MMBtu
$5,895
TOTAL IMPLEMENTED $30,985 $23,720 $24,964
435,522
kWh
$126
-
MMBtu
$5,895
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs