Assessment Year | 1990 |
---|---|
Principal Product | HOMOGINIZED MILK & O.J. |
NAICS |
n/a
|
SIC | 2026: Fluid Milk |
Sales Range | $10 M to 50M |
# of Employees | 225 |
Plant Area |
n/a
|
Annual Production | 22,000
Tgal
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $503,333 | 8,776,378 |
kWh
|
$0.057 |
Natural Gas | $99,370 | 37,089 |
MMBtu
|
$2.68 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $63,543 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $30,985 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $20,546 | $12,840 |
$20,546
358,441
kWh
|
- | - | |
02 | 2.7263: Lower compressor pressure through a/c system modification | $10,130 | $10,000 |
$10,130
176,729
kWh
|
- | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,042 | $4,000 |
$1,042
18,171
kWh
|
- | - | |
04 | 3.4113: Treat and reuse rinse waters | $5,895 | $4,000 | - | - | $5,895 | |
05 | 2.2511: Insulate bare equipment | $386 | $300 |
$386
6,741
kWh
|
- | - | |
06 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $126 | $180 | - |
$126
-
MMBtu
|
- | |
07 | 2.2621: Modify refrigeration system to operate at a lower pressure | $22,428 | $20,000 |
$22,428
391,266
kWh
|
- | - | |
08 | 2.4133: Use most efficient type of electric motors | $2,990 | $2,400 |
$2,990
52,169
kWh
|
- | - | |
TOTAL RECOMMENDED | $63,543 | $53,720 |
$57,522
1,003,517
kWh
|
$126
-
MMBtu
|
$5,895 | ||
TOTAL IMPLEMENTED | $30,985 | $23,720 |
$24,964
435,522
kWh
|
$126
-
MMBtu
|
$5,895 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs