| Assessment Year | 1990 |
|---|---|
| Principal Product | VETERINARY PHARMACEUTICAL |
| NAICS |
n/a
|
| SIC | 2834: Pharmaceutical Preparations |
| Sales Range | $10 M to 50M |
| # of Employees | 170 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 4,500
hrs
|
| Location (State) | Kansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $247,709 | 5,667,058 |
kWh
|
$0.044 |
| Natural Gas | $112,700 | 28,531 |
MMBtu
|
$3.95 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $25,695 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $22,772 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.6232: Install set-back timers | $3,805 | $140 |
$3,805
87,046
kWh
|
- | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $467 | $6,120 |
$467
10,551
kWh
|
- | - | |
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,576 | $2,878 |
$1,576
36,049
kWh
|
- | - | |
| 04 | 2.3212: Optimize plant power factor | $15,127 | $17,246 |
$15,127
-
kWh
|
- | - | |
| 05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,417 | - | - |
$1,817
-
MMBtu
|
$(-400.0) | |
| 06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $380 | - | - |
$680
-
MMBtu
|
$(-300.0) | |
| 07 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $2,923 | $4,500 | - |
$2,923
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $25,695 | $30,884 |
$20,975
133,646
kWh
|
$5,420
-
MMBtu
|
$(-700.0) | ||
| TOTAL IMPLEMENTED | $22,772 | $26,384 |
$20,975
133,646
kWh
|
$2,497
-
MMBtu
|
$(-700.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs