ITAC Assessment: KU0301
ITAC logo
ITAC Assessment: KU0301
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product VETERINARY PHARMACEUTICAL
NAICS
n/a
SIC 2834: Pharmaceutical Preparations
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,500
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $247,709 5,667,058
kWh
Natural Gas $112,700 28,531
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,695 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,772

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.6232: Install set-back timers $3,805 $140 $3,805
87,046
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $467 $6,120 $467
10,551
kWh
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,576 $2,878 $1,576
36,049
kWh
- -
04 2.3212: Optimize plant power factor $15,127 $17,246 $15,127
-
kWh
- -
05 2.1233: Analyze flue gas for proper air/fuel ratio $1,417 - - $1,817
-
MMBtu
$(-400.0)
06 2.1233: Analyze flue gas for proper air/fuel ratio $380 - - $680
-
MMBtu
$(-300.0)
07 2.2449: Recover heat from exhausted steam, hot air or hot water $2,923 $4,500 - $2,923
-
MMBtu
-
TOTAL RECOMMENDED $25,695 $30,884 $20,975
133,646
kWh
$5,420
-
MMBtu
$(-700.0)
TOTAL IMPLEMENTED $22,772 $26,384 $20,975
133,646
kWh
$2,497
-
MMBtu
$(-700.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs