| Assessment Year | 1989 |
|---|---|
| Principal Product | EXTRUDED RUBBER HOSE |
| NAICS |
n/a
|
| SIC | 3052: Rubber and Plastics Hose and Belting |
| Sales Range | $10 M to 50M |
| # of Employees | 205 |
| Plant Area |
n/a
|
| Annual Production | 12,200,000
lb
|
| Production Hrs. Annual | 6,912
hrs
|
| Location (State) | Iowa |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $500,081 | 12,113,130 |
kWh
|
$0.041 |
| Natural Gas | $149,272 | 43,608 |
MMBtu
|
$3.42 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $30,915 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $24,366 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $218 | $119 |
$218
5,275
kWh
|
- | - | |
| 02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,367 | - | - |
$2,767
-
MMBtu
|
$(-400.0) | |
| 03 | 2.2414: Use waste heat from hot flue gases to preheat | $1,843 | $3,200 | - |
$1,843
-
MMBtu
|
- | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $339 | $1,200 |
$339
8,206
kWh
|
- | - | |
| 05 | 2.3212: Optimize plant power factor | $7,688 | $13,500 |
$7,688
-
kWh
|
- | - | |
| 06 | 3.4113: Treat and reuse rinse waters | $15,540 | $9,000 | - | - | $15,540 | |
| 07 | 2.2437: Recover waste heat from equipment | $2,339 | $7,000 | - |
$2,257
-
MMBtu
|
$82 | |
| 08 | 2.7447: Install vinyl strip / high speed / air curtain doors | $581 | $350 | - |
$581
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $30,915 | $34,369 |
$8,245
13,481
kWh
|
$7,448
-
MMBtu
|
$15,222 | ||
| TOTAL IMPLEMENTED | $24,366 | $24,169 |
$8,245
13,481
kWh
|
$581
-
MMBtu
|
$15,540 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs