ITAC Assessment: KU0295
ITAC logo
ITAC Assessment: KU0295
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product PACKAGED PROCESS MEATS
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area
n/a
Annual Production 31,000,000
lb
Production Hrs. Annual 4,860
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $243,195 5,485,346
kWh
Natural Gas $136,136 49,727
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,831 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,473

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $390 $576 $390
8,792
kWh
- -
02 2.4133: Use most efficient type of electric motors $2,793 $3,300 $2,793
63,013
kWh
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,741 $5,300 $3,741
84,408
kWh
- -
04 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $1,301 $150 $857
19,343
kWh
$444
-
MMBtu
-
05 2.1233: Analyze flue gas for proper air/fuel ratio $4,066 - - $6,066
-
MMBtu
$(-2,000.0)
06 2.1131: Repair faulty insulation in furnaces, boilers, etc $238 $200 - $238
-
MMBtu
-
07 2.1131: Repair faulty insulation in furnaces, boilers, etc $120 $200 - $120
-
MMBtu
-
08 2.7447: Install vinyl strip / high speed / air curtain doors $1,182 $500 $1,182
26,671
kWh
- -
TOTAL RECOMMENDED $13,831 $10,226 $8,963
202,227
kWh
$6,868
-
MMBtu
$(-2,000.0)
TOTAL IMPLEMENTED $13,473 $9,826 $8,963
202,227
kWh
$6,510
-
MMBtu
$(-2,000.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs