ITAC Assessment: KU0284
ITAC logo
ITAC Assessment: KU0284
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product FURFURAL AND ALCOHOL
NAICS
n/a
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 107
Plant Area
n/a
Annual Production 40,000,000
lb
Production Hrs. Annual 7,848
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $654,739 18,756,448
kWh
Natural Gas $177,602 63,884
MMBtu
LPG $880 275
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $995,258 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $995,258

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings LPG Savings Administrative Changes Savings
01 2.3412: Use waste heat to produce steam to drive a steam turbine-generator $831,745 $1,230,000 $654,884
18,762,017
kWh
- - $176,861
02 2.2692: Use outside cold water source as a supply of cooling water $139,391 $226,000 $2,670
76,495
kWh
- - $136,721
03 2.6232: Install set-back timers $16,143 $5,856 $16,143
462,485
kWh
- - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,092 $3,080 $4,092
117,233
kWh
- - -
05 2.4312: Improve lubrication practices $2,169 - $2,169
62,134
kWh
- - -
06 2.7291: Reschedule and rearrange multiple-source heating systems $618 - - - $618
-
MMBtu
-
07 2.4133: Use most efficient type of electric motors $931 $1,018 $931
26,671
kWh
- - -
08 2.6121: Reduce hot water temperature to the minimum required $169 - - $169
-
MMBtu
- -
TOTAL RECOMMENDED $995,258 $1,465,954 $680,889
19,507,035
kWh
$169
-
MMBtu
$618
-
MMBtu
$313,582
TOTAL IMPLEMENTED $995,258 $1,465,954 $680,889
19,507,035
kWh
$169
-
MMBtu
$618
-
MMBtu
$313,582
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings LPG Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs