ITAC Assessment: KU0280
ITAC logo
ITAC Assessment: KU0280
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product INJECTION MOLDED PLASTIC
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 130
Plant Area
n/a
Annual Production 9,000,000
lb
Production Hrs. Annual 7,200
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $221,409 5,448,124
kWh
Natural Gas $10,075 2,636
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,177 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,215

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $3,621 $500 $3,621
89,097
kWh
-
02 2.6212: Turn off equipment during breaks, reduce operating time $2,382 - $2,382
58,617
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,048 $2,032 $1,048
25,791
kWh
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $440 $100 - $440
-
MMBtu
05 2.6121: Reduce hot water temperature to the minimum required $250 - $250
6,155
kWh
-
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $293 $560 $488
12,016
kWh
$(-195.0)
-
MMBtu
07 2.4231: Reduce the pressure of compressed air to the minimum required $143 $40 $143
3,517
kWh
-
TOTAL RECOMMENDED $8,177 $3,232 $7,932
195,193
kWh
$245
-
MMBtu
TOTAL IMPLEMENTED $3,215 $140 $2,775
68,289
kWh
$440
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs