Assessment Year | 1989 |
---|---|
Principal Product | INJECTION MOLDED PLASTIC |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 130 |
Plant Area |
n/a
|
Annual Production | 9,000,000
lb
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $221,409 | 5,448,124 |
kWh
|
$0.041 |
Natural Gas | $10,075 | 2,636 |
MMBtu
|
$3.82 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $8,177 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,215 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $3,621 | $500 |
$3,621
89,097
kWh
|
- | |
02 | 2.6212: Turn off equipment during breaks, reduce operating time | $2,382 | - |
$2,382
58,617
kWh
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,048 | $2,032 |
$1,048
25,791
kWh
|
- | |
04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $440 | $100 | - |
$440
-
MMBtu
|
|
05 | 2.6121: Reduce hot water temperature to the minimum required | $250 | - |
$250
6,155
kWh
|
- | |
06 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $293 | $560 |
$488
12,016
kWh
|
$(-195.0)
-
MMBtu
|
|
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $143 | $40 |
$143
3,517
kWh
|
- | |
TOTAL RECOMMENDED | $8,177 | $3,232 |
$7,932
195,193
kWh
|
$245
-
MMBtu
|
||
TOTAL IMPLEMENTED | $3,215 | $140 |
$2,775
68,289
kWh
|
$440
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs