Assessment Year | 1989 |
---|---|
Principal Product | PRINTED CIRCUIT BOARDS |
NAICS |
n/a
|
SIC | 3672: Printed Circuit Boards |
Sales Range | $5 M to 10M |
# of Employees | 105 |
Plant Area |
n/a
|
Annual Production | 374
thousand feet
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $90,209 | 1,559,789 |
kWh
|
$0.058 |
Natural Gas | $8,474 | 2,124 |
MMBtu
|
$3.99 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $22,337 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7314: Reduce ventilation air | $7,959 | $2,250 |
$6,539
113,130
kWh
|
$1,420
-
MMBtu
|
|
02 | 2.4322: Use or replace with energy efficient substitutes | $6,065 | $2,775 |
$6,065
104,924
kWh
|
- | |
03 | 2.7226: Use computer programs to optimize hvac performance | $2,439 | $3,600 |
$2,439
42,204
kWh
|
- | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,101 | $2,112 |
$2,101
36,342
kWh
|
- | |
05 | 2.4221: Install compressor air intakes in coolest locations | $1,474 | $300 |
$1,474
25,498
kWh
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $390 | $766 |
$390
6,741
kWh
|
- | |
07 | 2.6212: Turn off equipment during breaks, reduce operating time | $948 | - |
$948
16,413
kWh
|
- | |
08 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $504 | $700 |
$711
12,309
kWh
|
$(-207.0)
-
MMBtu
|
|
09 | 2.4312: Improve lubrication practices | $457 | - |
$457
7,913
kWh
|
- | |
TOTAL RECOMMENDED | $22,337 | $12,503 |
$21,124
365,474
kWh
|
$1,213
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs