ITAC Assessment: KU0277
ITAC logo
ITAC Assessment: KU0277
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product PRINTED CIRCUIT BOARDS
NAICS
n/a
SIC 3672: Printed Circuit Boards
Sales Range $5
M
to 10
M
# of Employees 105
Plant Area
n/a
Annual Production 374
thousand feet
Production Hrs. Annual 8,400
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $90,209 1,559,789
kWh
Natural Gas $8,474 2,124
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,337 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7314: Reduce ventilation air $7,959 $2,250 $6,539
113,130
kWh
$1,420
-
MMBtu
02 2.4322: Use or replace with energy efficient substitutes $6,065 $2,775 $6,065
104,924
kWh
-
03 2.7226: Use computer programs to optimize hvac performance $2,439 $3,600 $2,439
42,204
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,101 $2,112 $2,101
36,342
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $1,474 $300 $1,474
25,498
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $390 $766 $390
6,741
kWh
-
07 2.6212: Turn off equipment during breaks, reduce operating time $948 - $948
16,413
kWh
-
08 2.1311: Replace electrically-operated equipment with fossil fuel equipment $504 $700 $711
12,309
kWh
$(-207.0)
-
MMBtu
09 2.4312: Improve lubrication practices $457 - $457
7,913
kWh
-
TOTAL RECOMMENDED $22,337 $12,503 $21,124
365,474
kWh
$1,213
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs