Assessment Year | 1988 |
---|---|
Principal Product | RECREATIONAL VEHICLES |
NAICS |
n/a
|
SIC | 3716: Motor Homes |
Sales Range | $10 M to 50M |
# of Employees | 110 |
Plant Area |
n/a
|
Annual Production | 750
pieces
|
Production Hrs. Annual | 2,125
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $89,587 | 1,322,098 |
kWh
|
$0.068 |
Natural Gas | $42,845 | 15,315 |
MMBtu
|
$2.80 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $28,612 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,698 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,368 | $16,108 |
$7,368
108,734
kWh
|
- | - | |
02 | 2.4239: Eliminate or reduce compressed air usage | $2,463 | $1,660 |
$2,463
36,342
kWh
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,463 | $775 |
$2,463
36,342
kWh
|
- | - | |
04 | 2.2437: Recover waste heat from equipment | $1,151 | $1,000 | - |
$1,151
-
MMBtu
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $755 | $940 |
$755
11,137
kWh
|
- | - | |
06 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,192 | - |
$1,692
-
kWh
|
- | $(-500.0) | |
07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $4,329 | $7,575 | - |
$4,329
-
MMBtu
|
- | |
08 | 2.7261: Install timers and/or thermostats | $4,749 | $15 |
$179
2,638
kWh
|
$4,570
-
MMBtu
|
- | |
09 | 2.7224: Reduce space conditioning during non-working hours | $1,221 | - | - |
$1,221
-
MMBtu
|
- | |
10 | 3.4113: Treat and reuse rinse waters | $2,921 | $4,700 |
$60
879
kWh
|
- | $2,861 | |
TOTAL RECOMMENDED | $28,612 | $32,773 |
$14,980
196,072
kWh
|
$11,271
-
MMBtu
|
$2,361 | ||
TOTAL IMPLEMENTED | $8,698 | $10,290 |
$3,218
47,479
kWh
|
$5,480
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs