ITAC Assessment: KU0269
ITAC logo
ITAC Assessment: KU0269
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product FORMED PLASTIC SHAPES
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 98
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 3,402
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $112,565 1,285,463
kWh
Natural Gas $15,139 3,558
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,821 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,991

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2531: Re-size charging openings or add movable cover or door $17,859 $10,000 $17,859
203,986
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,858 - $1,858
21,102
kWh
- -
03 2.7261: Install timers and/or thermostats $5,967 $5,600 $744
8,499
kWh
$5,223
-
MMBtu
-
04 2.1123: Install automatic stack damper $243 $450 - $243
-
MMBtu
-
05 3.4115: Recover and reuse cooling water $728 - - - $728
06 2.6121: Reduce hot water temperature to the minimum required $166 - $128
1,465
kWh
$38
-
MMBtu
-
TOTAL RECOMMENDED $26,821 $16,050 $20,589
235,052
kWh
$5,504
-
MMBtu
$728
TOTAL IMPLEMENTED $7,991 $5,600 $2,730
31,066
kWh
$5,261
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs