ITAC Assessment: TN0414
ITAC logo
ITAC Assessment: TN0414
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product MEN SUITS & SPORT COATS
NAICS
n/a
SIC 2311: Men's and Boys' Suits, Coats, and Overcoats
Sales Range $50
M
to 100
M
# of Employees 925
Plant Area
n/a
Annual Production 700,000
pieces
Production Hrs. Annual 3,995
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $155,234 3,143,904
kWh
Natural Gas $86,111 24,048
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,860 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,896

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2135: Repair and eliminate steam leaks $2,941 $500 - $2,941
-
MMBtu
-
02 2.7123: Keep lamps and reflectors clean $11,964 - $11,044
225,381
kWh
- $920
03 2.2136: Install / repair insulation on steam lines $2,891 $1,405 - $2,891
-
MMBtu
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $1,019 $3,000 - $1,019
-
MMBtu
-
05 2.6212: Turn off equipment during breaks, reduce operating time $810 - - $810
-
MMBtu
-
06 2.2122: Install / repair insulation on condensate lines $641 $200 - $641
-
MMBtu
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $862 $480 $862
17,585
kWh
- -
08 2.4231: Reduce the pressure of compressed air to the minimum required $732 - $732
14,947
kWh
- -
TOTAL RECOMMENDED $21,860 $5,585 $12,638
257,913
kWh
$8,302
-
MMBtu
$920
TOTAL IMPLEMENTED $9,896 $5,585 $1,594
32,532
kWh
$8,302
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs