ITAC Assessment: KU0263
ITAC logo
ITAC Assessment: KU0263
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product ENVELOPES
NAICS
n/a
SIC 2677: Envelopes
Sales Range $5
M
to 10
M
# of Employees 115
Plant Area
n/a
Annual Production 590,778,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $97,114 2,145,076
kWh
Natural Gas $10,560 2,870
MMBtu
Other Energy $3,470 482
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,015 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,109

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Energy Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,737 $5,000 $1,737
38,394
kWh
- - -
02 2.6231: Utilize controls to operate equipment only when needed $2,188 $4,000 $2,188
48,359
kWh
- - -
03 2.2437: Recover waste heat from equipment $1,211 $1,600 - $1,211
-
MMBtu
- -
04 2.4133: Use most efficient type of electric motors $1,486 $1,308 $1,486
32,825
kWh
- - -
05 2.1233: Analyze flue gas for proper air/fuel ratio $219 - - $519
-
MMBtu
- $(-300.0)
06 2.6214: Shut off pilots in standby equipment $187 - - $217
-
MMBtu
- $(-30.0)
07 2.6121: Reduce hot water temperature to the minimum required $269 - - $269
-
MMBtu
- -
08 2.8223: Add air shields to trucks to increase fuel mileage $108 - - - $108
-
MMBtu
-
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $610 $920 $610
13,482
kWh
- - -
TOTAL RECOMMENDED $8,015 $12,828 $6,021
133,060
kWh
$2,216
-
MMBtu
$108
-
MMBtu
$(-330.0)
TOTAL IMPLEMENTED $5,109 $7,908 $3,223
71,219
kWh
$2,216
-
MMBtu
- $(-330.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Energy Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs